Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| locations:pumphouse [2026/06/27 23:52] – created zeagle | locations:pumphouse [2026/07/03 22:07] (current) – zeagle | ||
|---|---|---|---|
| Line 10: | Line 10: | ||
| This building contains the majority of the Yodelin water system components, including the mains pressure pumps, the system controller, the filtration systems, and spare parts. | This building contains the majority of the Yodelin water system components, including the mains pressure pumps, the system controller, the filtration systems, and spare parts. | ||
| + | {{: | ||
| ---- | ---- | ||
| Line 20: | Line 21: | ||
| ====== History ====== | ====== History ====== | ||
| - | After 9/11 the federal government mandated that the pump house be secured via a fence to prevent terrorist attacks. Remnants of the fencing can still be found near and around the pump house. | + | After 9/11 the federal government mandated that the pump house be secured via a fence to prevent terrorist attacks |
| < | < | ||
| {{: | {{: | ||
| < | < | ||
| </ | </ | ||